How to Buy

Payment
Deposit to start
Balance after inspection
Production
30–45 days
Up to 60 in peak months or for complex mixes
Order to warehouse
60–90 days
75–110 days
Middle East
Latin America
Includes production. A first shipment runs longer if the import permit is not ready before loading.

First container

  1. Confirm the destination and start that country's import permit on day one. It often takes 30–90 days, runs alongside production, and has to be in hand before loading. For July 4 or New Year, see the sourcing calendar.
  2. Pick categories from the catalog. Each item is ordered by the full carton, and export starts at one mixed 20ft container.
  3. We quote. You confirm samples or photos against that list, then agree payment terms.

    Printed brand, if this order needs one: private label / OEM on the same container, not a separate first order.

  4. We produce and prepare the export dangerous‑goods documents. You pay the balance after pre‑shipment inspection, and on FOB terms you arrange ocean booking before we load the container. Clearance at destination is yours.